2021 EA Flood Award - WINNER

All Posts by SAFAG Admin

Spring 2024 Update

The SAFAG team have been very busy, in both 2023 and 2024 carrying out a multitude of intervention assessments, then followed by the required repairs/maintenance to the natural flood management leaky woody dams some of which have been damaged following the extremely heavy and regular storms over the winter periods.

Read More

SAFAG WINS EA AWARD

Shipston Area Flood Action Group (SAFAG) has been awarded the Environment Agency Flood and Coast Excellence 2021 Award for Community Partnership. SAFAG is a community led volunteer team which aims to reduce the risk of flooding to homes and businesses by installing Natural Flood Management (NFM) measures across the entire

Read More

CHRISTMAS FLOODING 2020

Fortunately it is very unusual for the monitoring station in the middle of Shipston to go over 3 metres twice in a few days due to very heavy rainfall.  This flooding gave many ‘at risk residents’, the Town Council and its contractors a lot of  stress over the festive season. 

Read More

Statement from Emma Howard Boyd, Chair of the Environment Agency

This year, the terrible impacts of the coronavirus reminded the world that for all humanity’s achievements, nature can change everything at a moment’s notice. As we rebuild, the importance of being well prepared for the future threats is a lesson we must learn all over again. The Prime Minister has

Read More

Mid 2020 Update

Shipston Area Flood Action Group (SAFAG) has continued its programme of flood alleviation measures throughout the lockdown period with existing health and safety procedures augmented for social distancing and appropriate use of PPE for contractors where relevant. As all our work is outside, and being blessed with good weather, our

Read More

Spring 2020 Update

Our Steering Group have worked hard over the winter period, engaging with landowners, drawing up plans and then applying for consent to Warks County Council. This hard work is now enabling our contractors to install a multitude of interventions on numerous watercourses across the catchment. SAFAG continue to work well

Read More

Late 2019 Update

It is great to report that many of our Phase 2 projects are nearing completion.. This means over 120 NFM interventions have been completed in the last 3 months.  October 28th – The SAFAG Chair and Secretary presented an update powerpoint to over 30 residents/flood group members of Long Compton

Read More