2021 EA Flood Award - WINNER

Spring 2024 Update

The SAFAG team have been very busy, in both 2023 and 2024 carrying out a multitude of intervention assessments, then followed by the required repairs/maintenance to the natural flood management leaky woody dams some of which have been damaged following the extremely heavy and regular storms over the winter periods. In this time we have  refurbed and repaired 870 NFM installations.

SAFAG Admin

VIEW ALL POSTS

Leave a reply

Your email address will not be published. Required fields are marked *